Quality & Inspection

Quality control built into every production run.

Quality Mould Inc. is registered to ISO 9001:2015 through PRI Certification. Quality support includes in-process checks, final inspection, and First Article Inspection for every new production run.

ISO 9001:2015 Certified badge
Quality & Certifications

ISO 9001:2015 certified through PRI Certification. Established in 1983.

Registered to ISO 9001:2015 through PRI Certification for machining across industrial, medical, power generation, and commercial applications. Certificate No. 18914 is valid through February 13, 2027.

ISO 9001:2015 Certified PRI Certification Certificate No. 18914 Established 1983
View ISO certificate PDF
Inspection Equipment

Measured with CMM and precision inspection tools.

Inspection is built into the production process. The team uses a Hexagon Global S CMM along with micrometers, calipers, gauges, and other precision tools to verify critical dimensions and support repeatable results.

Hexagon Global S CMM In-process inspection on every order Final inspection on every order First Article Inspection on every new production run
Inspection & Measurement
Hexagon CMM inspection support at Quality Mould
CMM and inspection support

Inspection support may include CMM verification and production documentation.

The Hexagon Global S CMM supports dimensional verification for work that requires additional inspection discipline, while standard shop-floor inspection tools support in-process and final checks.

In-process checks Final inspection First Article Inspection for new production runs CMM inspection when required Documentation support based on customer requirements
Inspection Workflow

Inspection workflow from review to final verification.

01Plan inspection approach

Quality expectations are identified before work begins so inspection stays aligned with the manufacturing process.

02Confirm first production run

First Article Inspection is performed on every new production run to confirm requirements before repeat work continues.

03Inspect during production

In-process inspection supports consistency and helps reduce risk before final verification.

04Verify before shipment

Every order receives final inspection before parts are released for delivery.

Documentation

Quality documentation when required

Inspection records, First Article Inspection documentation, and required quality documentation can be provided when specified for the work.

Confidential Handling

Project information stays protected.

Customer project information and proprietary manufacturing details are handled as confidential project information.

Request a Quote