Quality control built into every production run.
Quality is built into the production process through ISO 9001:2015 certification, in-process checks, final inspection, and First Article Inspection for every new production run.
ISO 9001:2015 certified. Established in 1983.
Registered to ISO 9001:2015 through PRI Certification for machining across industrial, medical, power generation, and commercial applications. Certificate No. 18914 is current certification status.
Measured with CMM and precision inspection tools.
Inspection is built into the production process. The team uses a Hexagon Global S CMM along with micrometers, calipers, gauges, and other precision tools to verify critical dimensions and support repeatable results.
Inspection workflow from review to final verification.
Drawings, revision levels, critical features, materials, and inspection notes are reviewed before production begins.
First Article Inspection is performed on every new production run to confirm requirements before repeat work continues.
In-process inspection supports consistency and helps reduce risk before final verification.
Every order receives final inspection before parts are released for delivery.
Available when required.
Inspection records, First Article Inspection documentation, and required quality documentation can be provided when specified by the RFQ or purchase order.
What to include with your quote request.
Please include drawings, models, revision levels, material specifications, critical tolerances, inspection requirements, quantity, and target delivery date.
Customer prints, models, inspection requirements, and project details are handled confidentially.
